EV Outlet archetype · Existing property or urban charging
A compact charging site on an existing property: a few bays, one DC unit, AC docks, signage, lighting and CCTV, with a pod as an option.

Supported planning facts
Planning references from the outlet tier catalogue and the site design brief. They organise a first conversation; they are not package specifications, do not establish that every plot in a band will fit, and are recalculated for the site, the selected equipment and the utility connection.
| Reference DC mix | One dual-outlet DC unit (the source lists 50 kW; Bapsule evaluates 30 or 60 kW floor units) |
|---|---|
| Reference AC mix | 2 × 22 kW Type 2 docks |
| Reference parking | 4 bays (2 DC + 2 AC), one accessible |
| Plot band | 2,000 – 4,400 sq ft (about 186 – 410 m²) |
| Reference demand | 100 kVA sanctioned load, verified against the final dock schedule |
| Electrical room | 3.0 × 4.0 m |
| Amenity selection | Signage, lighting, CCTV; a selected Pod as an option |
Installed capacity · Simultaneous output · Connection demand · Parking bays and concurrent vehicles are always stated separately. No plot is promised to fit a configuration on its area alone.
Equipment and amenities
The products the archetype is normally built from. The final schedule follows the site assessment and the connection.
BPX-DC-30-F
Fuel stations
BPX-DC-60-F
Highway hubs
BPX-AC-22
Destination charging
BPX-CAFE
A factory-built café shell with counter and fixed glazing that sits beside charging bays or on any forecourt setback.
BPX-SEC
A guard cabin and surveillance node with CCTV, access-control and backup-power options in a weather-sealed shell.
Scope
Site requirements
Planning minimums from the site design brief; verified against the measured plot, utility position and local approvals before drawings are frozen.
| Car DC bay | 3.0 × 5.5 m (minimum clear 2.7 × 5.0 m); charger side widened for cable handling and door swing |
|---|---|
| Car AC bay | 2.7 × 5.0 m (minimum clear 2.5 × 5.0 m) |
| Accessible bay | 3.6 × 5.0 m, at least one per site, level and adjacent to the charger |
| Bus or light-commercial bay | 4.0 × 14.0 m, pull-through preferred, heavy-duty pavement — Highway Hub option |
| Cabinet to cabinet | 0.8 m for ventilation and side service access |
| Charger front to vehicle | 1.0 – 1.2 m operator zone |
| Charger rear to wall or column | 0.6 m for the service door and conduit entry |
| Cable reach | Verified with the supplied cable: the design brief assumes 5 m with about 4 m reach; the Dock catalogue states 4 m cables |
| Drive aisle | 6.0 – 7.0 m two-way · 3.5 – 4.0 m one-way |
| Entry and exit | 6.0 m gate, or 2 × 3.5 m with separate in and out on busy sites |
| Turning radius | 6.0 m inner kerb for cars · 12.5 m swept path for buses |
| Canopy clear height | 5.0 m for cars · 5.5 m for buses |
| Fire-tender access | 6.0 m clear perimeter route |
| Electrical / LT room | 3.0 × 4.0 m · 3.5 × 5.0 m · 4.0 × 6.0 m by archetype |
| Transformer yard | 3 × 3 m (Growth) · 4 × 4 m (Highway Hub), fenced with 3 m setback, where the connection requires it |
| Storage enclosure | 3 × 3 m ventilated, separated enclosure when storage is in scope (Highway Hub) |
Enquire
No. The three archetypes organise a first conversation. Each outlet is engineered for its site and quoted as one project contract with a reconciled bill of quantities after a site assessment.
Bapsule EV Docks from the catalogue. Starter sites are evaluated around 30 or 60 kW DC floor units with 22 kW AC docks; Growth sites around the 120 kW dual-gun unit; higher-power hub options are engineered to order. Every mix is recalculated for demand, bays and the utility connection.
A plot band is not a fit. Bays, aisles, turning, clearances, the electrical room and the connection are checked against the measured plot during the site assessment.
A defined provision — structure, space, cabling route or interface — not installed equipment. Solar arrays and storage systems are engineered, listed and quoted separately.
Pricing
Request a project quotation
An EV Outlet is quoted as one project contract with a reconciled bill of quantities after a site assessment: the approved dock schedule, the selected pods, site works, integration and acceptance. Land, connection deposits, utility upgrades, third-party approvals and operating costs are stated separately.