How it works
Docks, pods and outlets move through the same four stages. Each stage states what Bapsule does where contracted and what the customer, consultants or utility provide, so nothing is assumed and nothing is counted twice.
The four stages
Qualify the need and the site, and set the design basis.
Freeze the specification, exclusions, bill of quantities, programme and acceptance criteria.
Fabricate, procure, inspect and prepare the site for delivery.
Install, test, demonstrate, hand over and support.
Responsibilities
| Stage | Bapsule, where contracted | Customer, consultants or utility |
|---|---|---|
| Assess |
|
|
| Engineer |
|
|
| Build & Integrate |
|
|
| Commission & Support |
|
|
Readiness checklist
Start here
An incomplete checklist is normal at the first enquiry. The assessment stage exists to close the gaps.
Timing basis
Every programme states its stages separately. No single figure covers an order from enquiry to operation.
Quoted per configuration; the café shell is stated at 15 – 20 working days.
Placement of a factory-built pod on a prepared pad is a 72-hour target once the site is ready.
Utility connection, civil works and statutory approvals follow their own timelines and often govern the programme.
Mount, connect, test and demonstrate; site acceptance closes the stage.
Acceptance and handover
Every unit is function-tested in the factory before dispatch and tested again after installation against the agreed criteria. Warranty for the shell, purchased equipment, site work and any software starts from the events stated in the quotation, each with its own responsible party.
Tell us the site and the need. We reply with the assessment steps and what we need from you.